TURNKEY SOLUTIONS
- Site Acquisition
- Preliminary site survey
- Site survey
- Report of site survey
- Frequency planning & Design of site
- Implementation work
- Database preparation and documentation
- Walk test & Optimization
- Site handover to customer
- Distributed Antenna System (DAS)
RF DESIGN & PLANNING
- Nominal Design
- Design by using tools iBwave
- Redesign
- Capacity Design
- Coverage Design
- Model Tuning
- Site Survey
- Site Acouisition
- TSS
- Drive Test
- Bechmark
MAINTENANCE
- BTS & MW
- Active Equipments
- Batteries
- AC & DC Power Supplies
- Air Conditioner Unit
- Diesel Generator Engine & Alternator
- Fire Alarm System
MOBILE BTS SOLUTIONS
- Flexibility for the Network
- Precision Design according to Customer Demand
- Operations can be handled by
- Fast and Easy Deployment
- Future Proof Design
- Various Size for all Network Needs